Flagship guide · Boating
Boating from the Las Olas Isles: Canals, the New River & the Route to Port Everglades
By Glen Primak, GLEN PRIMAK GROUP · Updated
The short answer
The nine Las Olas Isles run south from East Las Olas Boulevard toward the New River. The usual way out is down your canal to the New River, east along the river to the Atlantic Intracoastal Waterway (ICW), then south on the ICW to Port Everglades. NOAA’s Coast Pilot lists no bridges on the New River between the ICW and the US 1 (Kinney) tunnel, which is upstream of the isles. On the ICW leg to Port Everglades the only bridge is the SE 17th Street (Brooks Memorial) bascule bridge, with 55 ft of vertical clearance at mean high water when closed. Controlling depths differ by canal and are not published here; check your canal’s connection to the New River and its depth at low tide on a current NOAA chart and a survey.
| Leg | Where | What to expect | Source |
|---|---|---|---|
| Your canal | Dock to the New River | Widths, depths and turning room vary by canal; check at low tide. | Survey |
| New River (lower reach) | Isles to the ICW | No bridges listed below the US 1 tunnel. No wake; Tarpon Bend narrow with strong currents. | Coast Pilot 4, Ch. 12 |
| ICW southbound | New River mouth (ICW mile 1065.0 / 1065.3) to Port Everglades | SE 17th Street twin bascule, 55 ft closed (ICW mile 1065.9) | 33 CFR 117.261(z); FR 2026-00932 |
| Port Everglades | ICW mile 1066.3 | Inlet to the Atlantic. Harbormaster VHF Ch. 14 | Coast Pilot 4, Ch. 10 |
Step by step: Las Olas Isles to the Atlantic
- Leave your dock and head south down your canal. Check depth at your dock and along the canal at low tide, with a survey if needed.
- Turn east on the New River. The lower New River runs past the south ends of the isles to the ICW. Coast Pilot 4 limits speed on the New River to no wake and describes Tarpon Bend, about 0.6 mile above the mouth, as narrow, with strong currents and heavy traffic. Upriver (west) are the US 1 tunnel and downtown; you don’t pass them on the way out.
- Join the ICW and head south. Coast Pilot 4 says the New River is entered from the ICW through two connecting channels, at ICW mile 1065.0 and 1065.3, south of the East Las Olas bridge.
- Pass the SE 17th Street (Brooks Memorial) Bridge (ICW mile 1065.9). Under 33 CFR 117.261(z) it opens on the hour and half-hour, except weekdays (other than federal holidays) from 6:50 to 9:10 a.m. and 3:50 to 6:10 p.m., when it opens only at the top of the hour. Boats that fit under it in the closed position can pass at any time.
- Enter Port Everglades (ICW mile 1066.3) and run out the inlet. Commercial traffic, cruise ships and security zones are common. Monitor the harbormaster on VHF Ch. 14 and watch posted manatee and slow-speed zones.
What the clearances mean for your boat
- Under 55 ft air draft: you can usually pass under the 17th Street bridge without an opening, subject to the tide and the clearance boards.
- Over 55 ft: you need a 17th Street opening. Plan around its weekday rush-hour limit.
- Heading north on the ICW: the East Las Olas bascule bridge (ICW mile 1064.0) has 24 ft closed at center and opens at :15 and :45, under 33 CFR 117.261.
Clearances are published at a stated datum, usually mean high water. Actual clearance falls on spring tides and king tides, so read the clearance boards on approach.
Charts and publications to keep aboard
- NOAA Electronic Navigational Charts (ENC). NOAA canceled its traditional paper and raster charts for this area in 2024; use current ENC data.
- U.S. Coast Pilot 4: Chapter 12 covers the ICW and New River through Fort Lauderdale; Chapter 10 covers Port Everglades.
- Coast Guard Local Notices to Mariners for temporary bridge deviations, for example during the Fort Lauderdale International Boat Show.
Dock and seawall rules
These are the City of Fort Lauderdale rules most relevant to a Las Olas Isles dock or seawall, from the Unified Land Development Regulations (ULDR) as amended by Ordinance C-23-05 (adopted March 23, 2023). They are a summary, not legal or engineering advice. Confirm the current code and permit requirements with the City before any project.
Seawall height (ULDR Sec. 47-19.13)
- A new seawall, or one being substantially repaired or rehabilitated, must work as a tidal flood barrier with a top elevation of at least 5 feet NAVD88.
- Applications submitted before January 1, 2035 may be permitted at 4 feet NAVD88, if the wall is designed to reach 5 feet NAVD88 by January 1, 2050.
- “Substantial repair” means work on more than 50% of the length of the property’s shoreline, or work costing more than 50% of the structure’s replacement value. That work must run along the property’s entire shoreline.
- The top of a new or modified barrier may not exceed the FEMA base flood elevation or 6 feet NAVD88, whichever is lower.
- Owners must keep seawalls in good repair. If tidal water flows through or over a wall onto a neighbor’s property or the street, the City can cite the owner. The owner must then show progress within 60 days and finish within 365 days.
- Contracts to sell property in tidally influenced areas of the city must include a specific tidal flood barrier disclosure.
Docks, lifts and how far you can extend (ULDR Sec. 47-19.3)
- Docks attached to a new or rebuilt seawall may sit up to 12 inches above the maximum allowed barrier elevation, if they are not poured as one piece with the seawall cap and don’t block water draining over the cap.
- Docks, lifts and similar mooring structures may not extend into the waterway more than 25% of its width or 25 feet, whichever is less, measured from the property line. Mooring or dolphin piles may extend up to 30% of the waterway width or 25 feet, whichever is less.
- A dock or lift needs a principal building on the lot.
- Lifts and davits: one per the first 100 feet of lot width, plus one more for each additional 100 feet. A second one on a lot between 100 and 200 feet wide needs Site Plan Level II approval. One personal-watercraft lift is allowed in addition. Lifts may be no more than 6½ feet above lot grade, and a hoisted boat’s lowest point may sit no more than 1 foot above the seawall cap.
- Boat length and side setbacks: a boat docked behind a home may not extend past the side setback lines for the house, extended out into the water. This is often what actually limits boat length on a canal lot.
- No boathouses or boat covers in the required setback area or over a public waterway.
Boating questions to ask about a specific Las Olas Isles lot
- Which canal does the dock face, and how does that canal reach the New River? How wide is it at the dock, and how much room is there to turn?
- What is the depth at mean low water at the dock and along the canal to the river, by survey?
- What dock, lift and seawall permits are on file with the City of Fort Lauderdale, and what condition is the seawall in, by inspection?
- How long a vessel fits within the lot’s side setback lines extended into the water, and how far a dock or lift can extend under the 25%-or-25-feet rule? See dock and seawall rules above.
Glen can pull the recorded permits and arrange a marine survey as part of a showing. Ask about a specific property →
Sources
- United States Coast Pilot 4, Chapters 10 & 12 (edition dated Oct 18, 2026): New River and the ICW through Fort Lauderdale — NOAA Office of Coast Survey (accessed Oct 24, 2026)
- 33 CFR 117.261 — Atlantic Intracoastal Waterway, from St. Marys River to Key Largo (eCFR, current) — National Archives / eCFR (accessed Oct 24, 2026)
- Federal Register 2026-00932 (Jan 20, 2026) — Drawbridge Operation Regulation, Atlantic Intracoastal Waterway, Fort Lauderdale — U.S. Coast Guard (accessed Oct 24, 2026)
- Federal Register 2012-8873 (Apr 13, 2012) — Drawbridge Operation Regulations, Atlantic Intracoastal Waterway, Fort Lauderdale (East Las Olas Bridge clearance) — U.S. Coast Guard (accessed Oct 24, 2026)
- NOAA Electronic Navigational Charts (ENC) — NOAA Office of Coast Survey (accessed Oct 24, 2026)
- Ordinance No. C-23-05, Exhibit 1 (adopted Mar 23, 2023): amends ULDR Sec. 47-19.3 and creates Sec. 47-19.13, Resiliency Standards for Tidal Flood Protection — City of Fort Lauderdale (Legistar, File 23-0168) (accessed Oct 24, 2026)
- ULDR Sec. 47-19.3, Boat slips, docks, boat davits, hoists and similar mooring structures (CAM 23-0433, Exhibit 2) — City of Fort Lauderdale (Legistar) (accessed Oct 24, 2026)
- Climate Resiliency: Seawall Master Plan & Tidal Barrier Ordinance — City of Fort Lauderdale (accessed Oct 24, 2026)
- City of Fort Lauderdale GIS: SiteAddressPoint layer (address points on the nine streets) — City of Fort Lauderdale (accessed Oct 24, 2026)